Refer and Earn |
Cities
Instant Budgeting

CostIntelligence

Calculate construction cost dynamically.

Estimator Inputs

Define Your Project

Rental ₹1,999/sqft
Medium ₹2,150/sqft
Premium ₹2,250/sqft
Supreme ₹2,700/sqft
1500
500 sqft 6,000 sqft
2
G Only G + 3 Floors
Approximate Cost
₹33,00,000

Cost calculations are based on standard excavation, structural frame, and finished layouts.

Civil Concrete Frame (55%) ₹18,15,000
Finishing Slabs & Painting (30%) ₹9,90,000
Vastu Architecture Plans (8%) ₹2,64,000
Plumbing & Electricals (7%) ₹2,31,000
Request Formal BOQ quotation
[ DS-BD / BUDGET DISTRIBUTION ]
Cost Inclusions

Detailed Budget Allocations

Learn how D Square Construction allocates funds across different project phases to guarantee durability.

55% / Civil Frame

Covers site excavation, foundation layout casting, Tata steel reinforcements, Ultratech cement concrete, and brick block masonry.

30% / Finishes & Paint

Covers wall plastering putty, vitrified floor tiles layups, granite stairs, main doors wood carpentry, and Asian Paints coatings.

8% / Vastu Architecture

Covers structural planning, digital 2D/3D elevations, Vastu compliance alignments, and municipal licensing checks.

7% / Plumbing & Wires

Covers Astral CPVC water channels, switchboard layouts, concealed electrical networks, and Jaquar bath fittings.

[ DS-MTR / MATERIALS REGISTER ]
Premium Brands

Official D Square Construction Material Partners

We source all construction elements from pre-approved brand vendors to ensure structural stability.

TATA Steel & UltraTech

We pour foundations exclusively with Fe 550D grade steel and Ultratech cement concrete mix, offering maximum load capacity.

Astral & Jaquar Fittings

Concealed CPVC pipes and bath fittings are sourced from Jaquar and Astral, ensuring leak-free plumbing operations for generations.

Asian Paints & Kajaria

Finished coatings are applied with Asian Paints Apcolite Premium, and tile layups utilize anti-skid Kajaria vitrified ceramics.

[ DS-FAQ / COST DESK ]
Estimator Help

Frequently Checked Inquiries

Have questions regarding built-up area calculation or brand upgrades? Click below.

Are excavation and soil leveling costs included in the estimate?

+

Yes, standard site clearing, leveling, and foundation excavation (up to 5 feet depth) are covered. Extenuating parameters (like hard rock drilling) are billed separately.

What if steel or cement market rates fluctuate during construction?

+

Once the turnkey contract is signed off, the raw materials prices are locked in by D Square. Any market price spikes during execution are fully absorbed by us.

Start Building

Ready to build your dream home
in Karnataka?

Connect with our managing director Danish to request a locked cost quote and schedule a site assessment.

Get Free Quote Call Advisor